PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripping the wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg Backfilled the underground roughing at room 173 Facing North (800x600).jpg Excavation for the underground roughing Facing North (800x600).jpg Installed safety cables and poles at Derrick -1 3rd Floor Facing North (800x600).jpg Metal decking at Derrick -1, -2 3rd Floor Facing East (800x600).jpg
Next page Stripping the wall forms along column line 6.5 (G-D) Facing South-West (800x600)
Stripping the wall forms along column line 6.5 (G-D) Facing South-West (800x600)